Skip to content
Clock Shift
Docs menu

Month, week and list

The three views, moving between periods, and the figures above the calendar.

Switching views

Tap Month, Week or List above the calendar. On a phone the list is the default; on a wider screen the month is.

ViewBest for
MonthThe shape of the month. Each day shows its shift as a coloured block with the code; on a wide screen, times and paid hours too. A “+N” means more than one shift that day. A column on the right totals each week.
WeekSeven tall columns with the code, times and paid hours of every shift. Empty days show “+”.
ListEvery day as a row. In the current month it starts at today — tap “Show the earlier N days” to see the rest.
The month view. The arrows either side of the month move you back and forward; the tabs switch view.

Moving between months and weeks

  • The ‹ and › arrows step a month in the month and list views, and a week in the week view.
  • Today (or This week in the week view) jumps back to now.
  • In the week view, the title is the date range — for example 21–27 Sep 2026.

The figures above the calendar

Five figures describe whatever is on screen — the month, or the week in the week view: shifts, paid hours, days worked, days off and your longest run of working days.

Good to know

A day whose only entry is a type that does not count as hours — Off, leave, sick — counts as neither a day worked nor a day off.

The panel beside the calendar

When no day is open, a panel shows what is on now or next, this week’s hours, and a key to your shift types. It sits beside the calendar on a computer and below it on a phone.

Reading the codes

Every shift shows its type’s code as text, not just its colour, so the calendar still reads for anyone who finds colours hard to tell apart. A shift with no type shows a dot.